Pricing

Starting points

Final pricing follows your specification review.

Rate bands

Indicative Sort columns
Standard1,200 USD
Priority1,800 USD

Need a firm quote?

Send drawings or BOM lines.

What drives a structural quote

Drawing completeness

Missing weld symbols or ambiguous anchor layouts trigger an RFI before price. Complete packages quote faster and hold longer.

Material volatility

Quotes reference published steel indices with valid-until dates. Long-lead jobs can lock material with a deposit when you need certainty.

Inspection scope

Third-party weld inspection, UT and special tests are line items, not surprises on the invoice.

Line items on structural quotes

Welding

WPS-backed welds are priced per joint type with optional UT or X-ray called out when your spec requires it.

Paint systems

Shop primer, intermediate and topcoat systems are listed separately so you can match the engineer's spec without hidden upsells.

Transport

Bundling, dunnage and escort requirements for oversized members appear as their own rows before you release the PO.

Engineering support

RFI responses and connection revisions during bid phase are included; sealed-stamp work is quoted if you need a PE review.

Pricing questions

Is freight included?

FOB Denver is standard. We can quote flatbed freight to your jobsite when you provide dock or crane details.

Do you offer install?

We partner with erectors we trust but do not self-perform field install. We can introduce teams that know our mark numbers.

How long are quotes valid?

Structural quotes reference steel indices with a printed valid-until date. Ask us to extend when your bid window moves.

After you accept

  1. 01

    Deposit

    Material deposits are optional but lock indices on long-lead packages.

  2. 02

    Fab release

    Bay time is reserved and your project manager sends a weekly photo if you want field updates.