CNC machining and mill-turn · Grand Rapids, Michigan

Tight-tolerance parts, quoted in one business day.

Northfield Precision Works runs 5-axis milling, mill-turn and small-batch production for medical, automation and defence buyers who need a dimensional report with every lot. Upload a STEP or PDF and a manufacturing engineer replies with price breaks, lead time and material certificate options before anyone asks you to chase.

First-article inspection is standard on every new part number.

A CNC milling spindle cutting aluminium with coolant mist in a bright shop

Plant capacity at a glance

CNC spindles under one roof
41
Typical quote turnaround
24 h
On-time delivery last year
98.4%
Years machining in Grand Rapids
38
What we machine

From one prototype to ten thousand pieces

Most jobs land in aluminium, stainless or engineering plastic, but the same team handles titanium brackets and PEEK insulators when the drawing calls for them.

Coolant spraying over a milling cutter working in metal

5-axis milling

Impellers, housings and manifold blocks in a single setup, with in-process probing on every pallet changer.

An operator monitoring a CNC control screen beside a machining centre

Mill-turn and turning

Live tooling on lathes up to 320 mm swing for shafts, fittings and hydraulic bodies that would otherwise need two operations.

Inspection and finishing

CMM reports, deburr, passivation and anodising through audited partners, all referenced on the packing slip.

Machined metal components laid out on a inspection bench

Lot traceability

Heat numbers, tool life logs and operator badges travel with each box so your quality team can audit without a phone call.

How an order runs

Drawing to labelled carton

  1. 01

    Upload and review

    An engineer checks tolerances, suggests design-for-manufacturing tweaks and flags any missing datums before pricing.

  2. 02

    Quote with breaks

    You receive quantity breaks, material certificate level and a realistic lead time, usually within twenty-four hours.

  3. 03

    First article

    The first piece is measured on the CMM and held until you approve the report or request a revision.

  4. 04

    Production and ship

    Lots are labelled per your PO, packed with inspection data and shipped on the date we committed to.

Machine park

Select a column heading to sort. Names describe machine class, not a vendor model number.

Main CNC assets Sortable columns
VMC-1100Vertical machining centre31,100 mm12,000 rpm9
5AX-6505-axis trunnion5650 mm20,000 rpm6
HMC-800Horizontal machining centre4800 mm10,000 rpm4
TL-320YMill-turn lathe5320 mm4,500 rpm8
SW-32Swiss-type lathe732 mm10,000 rpm7
VMC-1600Large vertical31,600 mm8,000 rpm3

Four decades on Division Avenue

The shop grew by adding shifts, not by buying brands customers do not care about.

  1. 1987

    Two verticals and a fax

    Tom and Elena Northfield quote jobs from a paper tray and run first-shift only.

  2. 2004

    5-axis arrives

    Impeller work for a regional aerospace supplier pays for the first trunnion machine.

  3. 2016

    Medical clean room

    A segregated cell with dedicated tooling serves instrument OEMs under ISO 13485.

  4. 2024

    Night shift

    Lights-out pallets on two horizontal centres cut lead times without hiding overtime from buyers.

Buyers who return

“Northfield caught a radius that would have bound in our assembly before we released the drawing company-wide. That one email saved a recall.”
Priya MenonManufacturing engineer, MedAxis Robotics
“Their first-article reports land in our quality portal with no retyping. When a dimension is out, they call before shipping, not after.”
Marcus LeclairSupplier quality, Lake Erie Automation
“We moved three jobs from overseas when lead times stretched. Northfield matched the price on two of them and beat it on the third.”
Hannah OseiOperations, Clearwater Hydraulics

Questions procurement asks

What is your minimum order?

One piece for prototypes. Production pricing typically starts at fifty pieces, but we will run smaller lots when the geometry demands it.

Do you supply material certificates?

Yes. EN 10204 3.1 certificates are standard; 3.2 is available on request for critical applications.

Can you work under our quality plan?

We support PPAP levels one through three and will sign your NDA before opening a drawing.

Which file types do you prefer?

STEP, IGES or native SolidWorks. PDF drawings are fine for quotes but we ask for a model before cutting metal.

Request for quote

Send a drawing for review

Attach a model or PDF up to twenty megabytes. In this preview the file stays in your browser and nothing is uploaded.

Drawing or model

Tour the shop floor

Buyers are welcome on Tuesday mornings. Bring a printout and we will walk the cell that would run it.