Refresh, same layout
New cabinets, counters, backsplash, lighting and paint without moving plumbing.
$38,000 and up
- Six to eight weeks on site
- Existing flooring protected
- Appliance allowance included
Most kitchen remodelers will not show a price until after a visit. We publish a sample ledger so you can compare scope against budget before anyone drives over.
Prices cover a 10 by 12 foot kitchen with mid-range selections and include permits and design.
New cabinets, counters, backsplash, lighting and paint without moving plumbing.
$38,000 and up
Demolition to studs, rewired and replumbed, with custom storage and a new floor.
$74,000 and up
Moved wall or relocated range, with an engineered beam and ventilation rerouted.
$118,000 and up
This is the kind of itemized breakdown every client receives. Sort by amount to see where the money goes.
| Demolition and disposal | 3,200 $ | Includes dumpster and floor protection |
|---|---|---|
| Cabinetry and hardware | 18,500 $ | Semi-custom, soft-close |
| Countertops | 6,400 $ | Quartz with an eased edge |
| Electrical | 4,800 $ | Four circuits and new lighting |
| Plumbing | 3,100 $ | Sink, dishwasher and gas range |
| Appliance allowance | 9,000 $ | You select, we coordinate |
| Tile backsplash | 2,200 $ | Allowance for materials and labor |
| Flooring | 3,800 $ | Engineered oak or luxury tile |
| Paint, trim and cleanup | 2,400 $ | Final clean included |
It becomes a fixed-price contract once you sign. Allowances are listed separately, and any difference is settled through change orders.
Ten percent to reserve your cabinet order and calendar slot. The balance follows four milestones: demolition, rough-in, cabinet install and final walkthrough.
We provide invoices for home equity lines and can introduce you to a local credit union that handles kitchen loans.