Sustainable architecture · Seattle

Buildings that earn their energy back.

Hearthline designs net-ready offices, housing, and schools with measured envelopes, electrified systems, and commissioning plans owners can operate—not only plaques on opening day.

Practice

Performance baked into design

Energy models, embodied carbon, and O&M manuals are deliverables—not side studies.

Wall section model showing insulation layers

Envelope first

Air tightness targets and thermal bridge details are drawn before cladding selections.

Mechanical room with heat pump racks

Electrified systems

Heat pumps, ERVs, and panel schedules sized for future PV and battery add-ons.

Energy model chart on a monitor

Modeled outcomes

We publish EUI targets and carbon budgets beside each design option.

Timber beam installation on site

Embodied carbon

Material swaps are logged with kgCO₂e comparisons before specs finalize.

Commissioning engineer at a BAS screen

Commissioning

Functional tests and trend logs are handed to facilities with alarm narratives.

Facilities team training in a control room

Operator training

We run handover sessions with screens showing how setbacks actually behave.

Measured impact

Average EUI reduction vs. baseline
42%
Projects targeting net-zero
18
Embodied carbon avoided
1,200 t
LEED Platinum certifications
11

Net-ready office retrofit

Phasing a 1980s tower without displacing tenants.

  1. 2026

    Electrification complete

    Boilers replaced with heat pumps; roof PV online with tenant-aware metering.

  2. 2025

    Envelope upgrades

    Window replacements and roof insulation done floor by floor on nights and weekends.

  3. 2024

    Baseline + modeling

    Blower door tests and energy model established owner targets and incentives.

Owner notes

“Our EUI dropped 38% in year one—and operators finally understand the setbacks.”
Andrea ChoPortfolio sustainability lead
“Embodied carbon swaps were documented so our lender could underwrite the timber upgrade.”
Marcus LeungDevelopment director
“Commissioning caught a VAV issue before occupancy—saved us a summer of complaints.”
Elena RuizFacilities manager

Performance team

  • Sofia AlvarezPrincipal, passive design
  • Jonah WeissEnergy model lead
  • Amira SolCommissioning director

Sustainability FAQ

Do you certify projects?

We lead LEED, WELL, and Living Building consultations with certifier coordination.

Can you retrofit occupied buildings?

Yes—phased envelopes and overnight mechanical swaps are our specialty.

How do you handle incentives?

We map utility rebates and document models for incentive reviewers.

What about mass timber?

We partner with structural engineers on fire, acoustics, and moisture details.

Do you monitor after opening?

Optional M&V retainers compare actual EUI to modeled targets.

Can you work with our CM?

We issue commissioning specs and attend prefunctional checklists on site.

How early should we involve you on a campus master plan?

Before land is purchased we can model solar access, stormwater, and EUI targets so each building inherits a shared carbon budget.

Retrofits

Tell us about your building

Share square footage, fuel type, and occupancy—we reply with a performance baseline proposal.

Targeting net-zero on your next lease?

We benchmark your portfolio, model tariff shifts, and identify the three upgrades with the fastest payback and the lowest disruption.