Landscape architecture · Pacific Northwest

Outdoor rooms that handle real weather.

Field & Fern plans quads, rain gardens, and trail networks with soils, maintenance crews, and storm codes in the same drawing set—so campuses stay usable in February, not only on opening day photos.

Practice metrics

Campus acres in construction
42
Municipal clients
18
Stormwater captured annually
3.2M gal
Native species by area
94%
Practice

Landscape that operations can maintain

We design with arborists, irrigation techs, and facilities teams at the table.

Grading plan review on site

Soils-first grading

Perc tests and infiltration models precede planting plans.

Rain garden during a storm event

Stormwater storytelling

Bioswales and cisterns are drawn with cleanout access and plant palettes.

Campus trail with tactile paving

Wayfinding in the landscape

Trail widths, lighting, and seating clearances meet accessibility from day one.

Native meadow in bloom

Ecological planting

We specify establishment watering and replacement ratios for the first five years.

Facilities team reviewing a maintenance binder

Maintenance manuals

Crews receive seasonal task lists tied to zones on the plan.

Construction staking in a quad

Permit-ready sets

Tree protection, erosion control, and lighting sheets are coordinated with civil.

Campus quad phasing

How we keep classes in session while landscapes transform.

  1. 2026

    Phase 3 planting

    Native understory and irrigation tuning while paths stay open via temporary decking.

  2. 2025

    Storm infrastructure

    Bioswales and permeable paving installed between terms with nightly reopening.

  3. 2024

    Master plan adoption

    Board approved zoning for gathering lawns, tree preservation, and service routes.

Facilities director notes

“Our crews finally have a irrigation map that matches valve boxes in the field.”
Andrea ChoUniversity facilities
“Storm inspectors signed off because details showed cleanouts and overflow paths.”
Marcus LeungCivil engineer
“Students use the quad in rain now—the paths drain and the seats stay dry.”
Elena RuizStudent life

Engagement packages

Monthly retainers for master planning through construction observation.

Save 2 months

Discover

Site analysis, precedent study, and illustrative master plan for one campus zone.

$5,200/mo

  • Site walk with facilities
  • Opportunities map
  • Board-ready boards
Start discover
Popular

Deliver

DD through permit sets with planting, grading, and lighting sheets.

$9,800/mo

  • Everything in Discover
  • Permit coordination
  • Irrigation design
Plan deliver

Observe

Construction administration with weekly site walks and punch support.

$14,200/mo

  • Dedicated PM
  • Weekly site reports
  • Warranty walkthrough
Talk to us

Landscape FAQ

Do you work outside the Pacific Northwest?

Yes—we partner with local soil scientists and nurseries in each climate zone.

Can you reuse our civil engineer?

We prefer integrated teams and can join their sheet index.

How do you handle existing trees?

Arborist reports inform protection fencing and root zone limits on every sheet.

What about snow loads on plazas?

We specify heated zones, snow storage, and equipment access where needed.

Do you design irrigation?

Yes—with smart controllers, flow monitoring, and drought contingency plans.

Can you help with grants?

We document green infrastructure benefits for stormwater credit applications.

Portland studio

Field & Fern, 2200 NW Quimby Street, Portland, OR 97210

  • Mon–Fri 8:30–17:30
  • Site walks by appointment

+1 (503) 555-0182

[email protected]

Planning a quad or trail project?

Send aerial photos and maintenance budgets—we respond with a scope letter in a week.